I'm losing track already, is this week 3 or 4. ( 3-1/2?)

Beth has been busy ripping up the vinyl and particle board from the floor. Exposing more of the green and tan tile squares. I've been puttering around with the electrical. Drilling holes and pulling wire around to the different plug boxes. It's a challenge getting the wire through the studs in a corner. I've been fishing a string through using bailing wire to push it and then hook it. Then I tie the string to the electrical wire and tape it up. Then push and pull a few inches at a time.

This weekend I plan on insulating the exterior walls and maybe some sheetrock work.